abc
QUICK LINKS:

Big Crane Delivery Begins at Vikings Stadium Site

Updated: 06/30/2014 6:37 PM
Created: 06/30/2014 1:59 PM KSTP.com

The Minnesota Vikings stadium construction site had an important delivery Monday.
    
Portions of a 400-foot mobile crane began arriving Monday, with a total of 70 truckloads schedule to drop off the sections over a 10-day period. The crane is needed to hoist the steel pieces forming the top of the roof that at its peak will be 300 feet high. The crane will move back and forth, once assembled, on tracks that stand more than 8 feet high.
    
There are already five fixed cranes on the site, ranging from 250 to 300 feet high.
    
Minnesota Sports Facilities Authority chairman Michelle Kelm-Helgen says 10 percent of the building has already been completed. The stadium is scheduled to open about two years from now.

Live Video: New Vikings stadium construction

The Associated Press contributed to this report.


Minneapolis/St. Paul

Broken Clouds
32°
28° | 28°
  • Feels like: 23° F
  • Wind: S 13mph
  • Humidity: 82%
  • Sat Mix of sun and clouds
    40° | 34°
  • Sun A few morning showers
    42° | 25°
  • Mon Windy, snow showers possible
    25° | 7°
  • Tue Mostly sunny
    22° | 12°

Video

KSTP NEWS