abc
QUICK LINKS:

$2.2M Wind Turbine at Veterans Affairs Site Idle

Created: 08/31/2014 5:17 PM KSTP.com
By: Cassie Hart

A $2.2 million wind turbine at a Department of Veterans Affairs facility in St. Cloud remains broken, and a series of repairs has been ineffective.
    
A St. Cloud Times report says there have been similar issues with wind turbines at VA facilities in two other states.
    
The turbine at the St. Cloud VA Health Care System hasn't worked in two years. Workers have made a series of hydraulic and electrical repairs with no luck. VA spokesman Barry Venable wouldn't say when, if ever, the turbine will generate power.
    
The St. Cloud site was one of four VA locations selected for wind power. A veterans' cemetery in Massachusetts has a working wind turbine, but facilities in Utah and New York have also failed.

(Copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)
 

Photo: U.S. Department of Veterans Affairs

Minneapolis/St. Paul

Broken Clouds
58°
68° | 48°
  • Feels like: 58° F
  • Wind: W 8mph
  • Humidity: 60%
  • Sat Mainly sunny
    65° | 40°
  • Sun Plenty of sun
    65° | 50°
  • Mon Showers possible in the afternoon
    65° | 45°
  • Tue More clouds than sun
    53° | 36°

Video

KSTP NEWS