abc
QUICK LINKS:

Crews Install New Video Billboard at Target Station in Mpls.

Updated: 03/22/2014 8:10 AM
Created: 03/22/2014 8:05 AM KSTP.com
By: Cassie Hart

A big step for the new Target Field Station in Minneapolis.

A giant, 16 by 29 foot video board is being installed on the top of the elevator core Saturday. It can be viewed from the great lawn and upper plaza.

In order to build the finished product, construction workers are putting eight panels up one by one throughout the day.

The whole station is expected to be done by mid-May.

Target Field Station will be the hub that connect the Metro Blue Line and Metro Green Line. The station provides several unique amenities, including public gathering space, and innovative architectural design.


Winter Weather Advisory

MN AREAS AFFECTED: Anoka; Carver; Chisago; Dakota; Goodhue; Hennepin; Isanti; Kanabec; Ramsey; Rice; Scott; Sherburne; Washington; Wright
Expires: 3/3/2015 9:00 PM

Winter Weather Advisory

WI AREAS AFFECTED: Barron; Chippewa; Dunn; Eau Claire; Pepin; Pierce; Polk; Rusk; St. Croix
Expires: 3/3/2015 9:00 PM

Minneapolis/St. Paul

Overcast
23°
29° | 22°
  • Feels like: 12° F
  • Wind: SSE 12mph
  • Humidity: 50%
  • Tue Morning snow
    30° | -1°
  • Wed Mix of sun and clouds
    9° | -6°
  • Thu Sunshine
    19° | 14°
  • Fri Partly cloudy
    37° | 17°

Video

KSTP NEWS