abc
QUICK LINKS:

Wis. Travelers Warned of Construction Delays

Created: 11/22/2013 6:06 AM KSTP.com
By: Jennie Olson

Travelers during the Thanksgiving holiday are being warned that ongoing construction projects and heavy traffic could cause delays over the next week.
    
The Wisconsin Department of Transportation says most highway construction projects have concluded for the year.
    
However, traffic volume is expected to be heavy on Friday as hunters flock to the woods for the start of deer hunting season and again on Wednesday, the day before Thanksgiving. The heaviest traffic day is expected to be the Sunday after Thanksgiving as both deer hunters and travelers return home.
    
The most significant ongoing construction projects are on U.S. 41 and at the Leo Frigo Bridge in Green Bay and at the Zoo Interchange and the Hoan Bridge in Milwaukee.

(Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)

Photo: MGN Online/cornell.edu

Dense Fog Advisory

WI AREAS AFFECTED: Barron; Chippewa; Dunn; Eau Claire; Pepin; Pierce; Polk; Rusk; St. Croix
Expires: 10/24/2014 10:00 AM

Minneapolis/St. Paul

Scattered Clouds
46°
70° | 50°
  • Feels like: 42° F
  • Wind: ESE 7mph
  • Humidity: 93%
  • Sat Abundant sunshine
    66° | 48°
  • Sun Partly cloudy
    71° | 50°
  • Mon A few clouds
    58° | 44°
  • Tue Mostly sunny
    50° | 35°

Video

KSTP NEWS