abc
QUICK LINKS:

2-Foot Sag in Pavement Closes Wisconsin Bridge

Created: 09/26/2013 3:44 PM KSTP.com
By: Scott Theisen

Traffic officials in Wisconsin say congestion has eased with drivers being successfully rerouted away from a bridge that was closed after a concrete support pier settled by a little more than 2 feet.
    
Department of Transportation traffic engineer Randy Asman said Thursday that the morning commute went pretty smoothly, as did the evening commute the night before.
    
The Leo Frigo Memorial Bridge in Green Bay was closed Wednesday after a long, deep dip was discovered in the pavement about 5 a.m.
    
Transportation officials say the bridge appears to have stabilized, but they are keeping an eye on it. They're also investigating what caused the sag.
    
The 30-year-old bridge carries about 40,000 vehicles a day over the Fox River.

(Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)

The Leo Frigo Memorial Bridge in Green Bay, Wis.

Minneapolis/St. Paul

Clear
69°
82° | 63°
  • Feels like: 69° F
  • Wind: SSW 3mph
  • Humidity: 73%
  • Fri Partly cloudy, chance of a thunderstorm
    83° | 65°
  • Sat A few clouds
    83° | 65°
  • Sun A few morning showers
    85° | 67°
  • Mon Times of sun and clouds
    82° | 65°

Video

KSTP NEWS